AIAG PSW PDF

36, X. 37, X. 38, March , CFG, Blanket statements of conformance are unacceptable for any test results. 39, SIGNATURE, TITLE, DATE. PSW. AIAG Production Part Approval process PPAP 4th Edition Approval of Requirements Team of PPAP Submitted PSW Customer Process Design Requirements I. Hello, in the pdf I can see a new revision from PSW. Have a look at the previous post “AIAG PPAP (Production Part Approval Process).

Author: Samum Neshicage
Country: Jordan
Language: English (Spanish)
Genre: Travel
Published (Last): 3 March 2010
Pages: 236
PDF File Size: 4.60 Mb
ePub File Size: 17.86 Mb
ISBN: 501-6-78630-149-4
Downloads: 32449
Price: Free* [*Free Regsitration Required]
Uploader: Brar

Part Submission Warrant (PSW)

See the Statistical Process Control reference manual for additional information in understanding the basic principles of statistical stability and process measures indices. For parts identified as black box see Glossarythe design record specifies the interface and performance requirements.

This page was last edited on 29 Octoberat The purpose of the initial process study is to understand the process variation, not just to achieve a specific index value. The quantity of product produced.

Production part approval process – Wikipedia

These are not necessarily intended to be Special Characteristics. The organization shall identify one of the parts measured as the master sample see 2. E-mail address of the person signing the declaration. C’k and Ppk are described below.

  ASSIMIL SUEDOIS SANS PEINE PDF

If requested by the customer, enter the checking aid number, its change level and date. Parts Produced at Additional Location x. ISIR is a summary of the initial sample being presented at what ever state.

The process steps at customer plants may be matrixed versus the Special Characteristics determined jointly by the organization and the customer. No additional shipments are authorized unless an extension of the interim approval is granted. Enter the date on which the master was approved. The initial process study data requirements inay be replaced by longer- term historical data from the same or similar processes, with aiab concurrence.

AIAG Production Part Approval process PPAP 4th Edition | G C –

Tool Purchase Order Number: Supplier or Material Source Change viii. Product produced after the tooling has For product that has been produced after tooling been inactive for volume production for has been inactive for twelve months or more: The weight shall not include shipping protectors, assembly aides, or packaging materials. The PPAP process is designed to demonstrate that a supplier has developed their design and production process to meet the client’s requirements, minimizing the risk of failure by effective use of APQP.

The specific cavities, molds, line, etc.

Production part approval process

During the transformation from bulk product to final product, both bulk product characteristics and final product attributes may be impacted by customer process controls. Unlike Cpk,Ppkis not limited to the variation within subgroups. Leave a Reply Cancel reply Your email address will not be published. The following figure provides a guideline for severity rankings. Authorized Customer Representative approval signature.

  LES CARROZ PISTE MAP PDF

Why won’t this happen again? It is replacement tooling not meant to describe standard tools new or repairedsuch as standard measuring devices, drivers manual or poweretc. Correction of a discrepancy on a previously Submission is required to correct any submitted part.

Material test results are not required for PPAP. Submission Level that Organization is required pss subinit to as defined by the Customer. The signature in the supplier certification area of the PSW indicates that the supplier-responsible person usually the Quality Engineer or Quality Manager has reviewed this package and that the customer-responsible person usually a Customer Quality Engineer or Customer Quality Manager has not identified any issues that would prevent its approbation.

Similar processes have experienced occasional failures, but not in major proportions. Change in Part Processing ix.

The manufacture of bulk materials consists of industries which span a variety of production processe: The process is not in statistical control.